From 2009 to 2018 (8 years) working as “SR. TELECOM TECHNICIAN” OFC network at oil and gas, Refinery OFFSHORE contacting company Abu Dhabi, Kuwait and Doha, Qatar".
I am doing all type of Telecom Infrastructure works (Underground cable laying, SPLICING (fujucura-80s, 70s,60s,50s),(Sumitomo T71C) OTDR,POWERMETER TESTING and TERMINATING for Fiber Optic Systems.
Experienced in the Supervision of Multiple Refinery, Onshore and offshore projects.
Experienced in providing technical support to customer and Implementation Team.
Installation Site Planning, Supervision, Method-Of-Procedure and As-built Documentations, Testing and Assist Commissioning, Site Survey, Switching Systems, Integration of Switching and Transmission Systems, Access Networks, GSM BTS Cabinets (HUAWEI BTS3900 BTS3900L) HUAWEI OSN Series and GPON Cabinets, LAN, Microwave RTN Series, Patching variable types of Optical Fiber Cables and Attenuators from Equipment ADM Switch side to Fiber Patch Panels to OSP ODF implementation of transmission circuit lines, trouble shooting and Integrations, Site Optimization of Circuit Ring Network Diagrams, Basic AutoCAD.
From 2018 April to July ( Qatar) working as ‘sr. TELECOM TECHNIAIAN’(Qatar Rail) DOHA METRO PHASE PROJECT) H.COM / THALES.
- Preparing the drawings and Foc schedule Red Line, Green Line and Gold Line .
- Remote Unite Room survey from Rail Track R01 and R02 to cross passage point.
- Underground Tunnel Foc cable laying (6fo to 288fo) and Jb splicing &Testing .
- monitor work carried out on various construction / Metro sites
- RF Cable lying from Microwave Antenna Omni Antenna, Panel antenna point.
- Install 1way,2 way,3 way splitter ,coupler installing Remote Unit room
- Monitoring systems installation process from start to End point.
- Supports in carrying out routine provision/maintenance & fault rectification tasks in respect of the assigned Core and Access Network elements.
- Carries out the day-to-day activities of circuit provision, cessations, re-routing.
- Perform installation of fiber optic equipment and patch panels.
- Installation of PAGA, Cctv all rail track .
- FO network system Fiber distribution frame installation and termination.
- Foc micro duct laying and inspecting.( 7x10/8mm)
From 2017 May to April 2018 (1 years Abu Dhabi) working as ‘sr. TELECOM TECHNICIAN’ (OFFSHORE AL DABIYA CLUSTER PROJECT) Archirodon (oil & Gas)
- Supervised in the termination of optical fiber cable at fiber distribution panel FDP, ODF, Patch Panel.
- Maintain portable radio equipment and base station.
- Maintain control room display monitors and links to and from plus all ITR ,ETR services .
- Armed Fiber cable 4f to 96fo laying, splicing and termination.
- Handled the tasks of supervising activities like section, training consoling and evaluation of telecom staff.
- Maintain system termination, configuration and drawing information ensuring Engineering records remain accurate
- Installation, commissioning, Start-up and Maintenance of all kinds of telecommunications systems
- SDH/PDH, FO network system rack installation and termination.
- System cable laying from DCS system rack to DCS Marshaling Rack ,FGS system Cabinet ,SDH Cabinet ,IPS system cabinet ,HIPPS system/marshaling cabinet.
- Aware of transmission technology & equipment’s including Cisco routers, switches, SDH, DWDM, firewall,…ect
- Attends planned/hazardous & outages related to transmission equipment’s & Fiber networks.
- Attends and clears faults reported by NOC’s related to Data Center and transmission devices using analyzer, light source & Power meter.
- ODTR testing for locating FO Cable faults and during cable outages.
- To keep knowledge and skills updated in respect of the new equipment technology Introduced to networks.
- Installation of PAGA/ACCS/CCTV/LAN cabinet
- Installation, Testing of Multiplex Microwave radio equipment and maintenance of Microwave Network to provide communication as voice, data & internet in between oil fields
- Experience in the review of single line diagram and P &ID’S
- Preparing the Punch lists and solving the Issues.
- Monitoring & supervising all the Telecom network commissioning activities.
From 2016 April to 2017 April (1 years Kuwait) working as TELECOM TECHNICIAN” (CLEAN FUEL PROJECT) KNPC MAB 1 & MAB 2) Kuwait Refinery ONSHORE. Oil &Gas
- Responsible for supervising and monitoring all the people involved in the process of fiber optic cable Testing, Installation and commission of the process control instrument
- Reporting to the IT Telecom engineer ensure all tasks allocated are carried out safty and efficiently.
- Responsible for developing performance plans for improving employee performance Conducted research and presented information to the organization.
- Quality control of fiber optic products supervision of fiber optic cable lying.
- VHF, UHF, Voice Radio equipment’s installation.
- Documenting test result cable route details update and redline the installation drawings, documents.
- CCTV camera installation and treble shooting of Refinery
- PCS cable laying and installation of refinery plant.
- Ensured that the telecommunication equipment’s are under the supervisor of concerned IT telecom person.
- PABX and PAGA/PAEAS system.
- UTP cable laying, arraigning and termination using server Rack.
- Installation/Assembling cabinets, racks and other communication equipment.
- Preparing reports and certification after finishing up other activities related to a particular event.
- Troubleshoot service interruption and trace fiber from exist network to customer.
- Basic Knowledge about SCADA SYSTEM and RTU
- Installation of Telephone Network PABX cabling.
From 2013 Dec to 2015 Nov (2 years Abu Dhabi ) working as “sr. TELECOM TECHNICIAN ” at KENTZ OFFSHOR contacting company.
- Installation-Fiber optic /Telecom Rack equipment Rack, NMS & logging recorder cabinet
- Installations of SDH equipment with SFP.
- Installation of PTZ, DUM, Explosion Cameras and Terminations.
- Carry out inspection underground Fiber Optics/Telecom cable systems, splicing, testing, termination, cable placement, construction and infrastructure.
- Covers all aspects of basic fiber/telecom, power line applications from receipt inspection and cable pull, Inspection to various forms of termination.
- LAN/WAN equipment’s, commercial satellite TV and CCTV systems.
- Data Networks LAN/WAN, Network Security and IP telephony.
- Telecommunications cable Network, PABX, FAX Machine, VHF, UHF radios and intercom system installed
- Security Automation Systems CCTV, Access Control, Intrusion Detection Systems
- UTP, Data cable termination and testing & commissioning.
- VHF, UHF, Voice Radio equipment’s installation and maintenance.
- PABX and PAGA/PAEAS system.
- Cat3, cat6 cable laying and termination using RJ 45, RJ 11.
- PLC, communication cable installation and termination for Telephone.
- PA system, paging system and Installation of Cisco routers, switches, Aggregators.
- Connecting Patch cord to switch room and Network point.
- Responsible for proper materials needed for jobs & completing site surveys
- Fault isolated and replaced for fiber, network & copper cables.
- Installation/Assembling cabinets, racks and other communication enclosures
- Troubleshooting fiber cables with OTDR and power meter.
- Organize splicing as-build files utilizing software packages for in house fiber cable inventory and route designs.
- Measurements the complete system and links by using OTDR, Power meter and Light source.
- Ensure non-conformances are identified, tracked and closed out prior to acceptance of the work Inspect Telecom/Fiber optic cables and connections for physical and mechanical damage.
- Verify that all Equipment / Cable connectors and splices are correctly installed.
- Ensure Fiber Optic cable pulling load and bend radius shall not exceed manufacture specifications Verify that all connectors and splices are correctly installed
- Verify cable identification markers, glands and fitting as per specification, earth bonding end armored fiber optic cables
- Carry out regular surveillances and issues surveillance reports To review Contractors test equipment calibration certification
- Providing the corrective solution for the breakdown or problem faced.
From 2011 Nov to 2013 Nov (2 years Qatar) working as “TELECOM TECHNIAN” at Doha, Qatar "Ooredoo” (QATAR TELECOM).
- Site surveys on Telecom MH duct to Network room or equipment room (CO)
- Coordinate and support team leader to maintain and rectify Optical fiber cable
- Planning and designing of infrastructure for MARP site.
- Installing & configuring telecommunication equipment such as Routers ,ONT
- Terminating (outdoor/indoor fiber optic cable) for fiber networks & labeling.
- Pulling the fiber optic cables between the exchanges or between exchanges up to Optical Network unit (ONU).
- Testing of Single mode & Multi mode Fiber using light source, Power meter, VFL, FOT-930, FSM-300 and OTDR (EXFO FTB-1, EXFO FTB-720, JDSU-400)
- Fusion Splicing of single mode and multimode fiber optic cables,(2-288fo) OSP and
- OSP work with Ariel cable and underground manhole cable splicing.
- Proficient in FTTH/FTTB networks(indoor & outdoor )Fiber Optic Cable , install Racks and patch panels, Fiber Termination Plc, splitter allocation, acceptance testing
- Termination of fiber optic cable connectors including ST’S, SC’S, LC’S &FC etc.
- Build out of ISP/OSP infrastructure for Map sites.
- Documentation and preparing OTDR graph for Fiber optic cable.
- Copper cable termination for MDF point to DP box.
- Handled the problems of customer service representatives.
- Have hands own experience in Copper cable Laying, Termination &Testing also.
- Solve the all Telecom/fiber optic cables problems.
From 2009 OCT 24th to 2011 OCT 24th (2 years India) working as Fiber Optic Telecom Technician in SFO TECHOLOGIES – OPTRONICS DIVISION (A NEST Group of Company Cochin)
During the working period I have good knowledge of these products and also have gained
Experience in the use of:-
- Fiber Optic Testing (Optical spectrum analyzer, Power meter, Light source meter)
- OTDR EXFO FTB- 1 FTB-100
- Termination (ST, FC, LC, SC, E2000, MTRJ, MPO, SMU,SCAPC,LCAPC)
- Fiber Patch cord assembly. (LC, SC, FC, 4FO etc.)
- Ribbon fiber cable splicing.
- Termination & Polishing of fiber connectors.
- Labeling fiber optic patch code.
- FDH, FDT and MTCA assembling and testing
- Arc Fusion Splicing (Using Fitel S 174H, Fitel S 175, Sumitomo 65 M12, Fujicura FSM – 30s Fujicura FSM-50s).